Skip to content
About
Request form
About
Request form
HIGH LOAD CONSENT
Request Form
1
Contact details
2
Route Information
3
High load consent details
4
Supporting documents
Contact details
First name
*
Surname
*
Company
*
Postal Address
*
Street address or PO Box
Town / City
Postcode
Mobile
*
Phone
Email
*
Network
*
Alpine Energy
Aurora Energy - Central
Aurora Energy - Dunedin
Buller Electricity
EA Networks
Mainpower
Marlborough Lines
Network Tasman
Network Waitaki
Orion NZ
PowerNet Limited
Westpower
Please select all the regions that the high load will pass through
Travelling from
*
Travelling to
*
Pilot driver and contact number
Proposed route
*
High load consent details
Application for transportation of a high load through Orion New Zealand Ltd network area
Proposed date
*
DD slash MM slash YYYY
Time
*
24 hour format
:
Hours
Minutes
Time for load entering neighbouring network
:
Hours
Minutes
Handover Location
Load type
*
Boat
Concrete Panels
Container
House
Machinery
Other (Specify below)
Pipes
Portable Buildings
Silo
Vehicle
Load type details
A - Overall width (metres)
*
B - Width of highest point (metres)
*
C - Overall height (metres)
*
Upload Supporting documents
Please attach any supporting documentation relevant to your application.
Supporting documents
Drop files here or
Select files
Accepted file types: pdf, txt, doc, docx, xls, xlsx, ppt, pptx, png, jpg, jpeg, gif, Max. file size: 100 MB.
BY SUBMITTING THIS APPLICATION, THE APPLICANT ACKNOWLEDGES AND AGREES AS FOLLOWS:
*
1. Any consent granted will be valid only for the date and times specified on the consent.
2. The consent and its terms and conditions shall be strictly adhered to.
3. The information submitted as part of this application, including date, time of entry and maximum height, is correct.
4. The driver of the transporting vehicle is required to carry a copy of the consent and produce it upon request.
5. The driver of the over-dimensional load must allow the load to be measured by Network Company staff on request. If the load is over the height stated, the consent becomes null and void.
6. All due care shall be taken during transportation of the load, whether or not the load is escorted.
7. The issuing of a consent by the Network Company does not exempt the consent holder from liability arising from damage to the electricity network caused by the load, whether it is escorted or not.
8. Where a Network Company escort is required:
(a) The driver of the transporting vehicle shall abide by the directions of their escort with respect to safeguarding the electricity network conductors and associated equipment during the transport of this load.
(b) The company transporting the high load is to supply mobile radios to the Network Company escort vehicle so they can communicate to the driver of the vehicle transporting the load. If radios are not available, the Network Company escort vehicle must be in front of the first over-dimensional load.
9. The applicant will pay all charges made by the Network Company and/or their approved contractors in relation to the transport of this load.
10. If any information provided by the applicant is incorrect and as a result damage is suffered, the applicant will cover all costs of repairing that damage and any claims by third parties arising from that damage, and will indemnify and keep indemnified the Network Company(ies) against such damage and claims, including consequential damage and legal and other costs associated with the same.
11. Additional charges will be incurred where:
(a) any changes and or cancellations to the scheduled time and/or date were not advised to the relevant Line Companies by 3:30pm on the day prior to the original departure time; or
(b) there is a "no show" by the applicant at the scheduled time and/or date.
I have read and accepted the above terms and conditions
CAPTCHA
Email
This field is for validation purposes and should be left unchanged.